| Engine Shutdown Check
A flight is never complete until the engine is shut down and the
airplane secured. Unless parking in a designated, supervised area, the pilot
should select a location and heading which will prevent the propeller or jet
blast of other airplanes from striking the airplane broadside. Whenever possible
the airplane should be parked headed into the existing or forecast wind. After
stopping on the desired heading, the airplane should be allowed to roll straight
ahead enough to straighten the nosewheel or tailwheel. Finally, the pilot should
always use the procedures in the manufacturer's checklist for shutting down the
engine and securing the airplane. Some of the important items include:
1. Set the parking brakes ON.
2. Set throttle to IDLE or 1000 RPM.
3. Turn ignition switch OFF then ON.
4. Set propeller control (if equipped) to
FULL INCREASE. 5. Turn electrical units and
radios OFF. 6. Set mixture control to IDLE
CUTOFF. 7. Turn ignition switch to OFF when
engine stops. 8. Turn master electrical
switch to OFF. 9. Install control lock.
10. Place chocks at wheels.
11. Tie down airplane.
 |
FAATest.com
- Aviation Library
Dauntless
Software hosts and maintains this library as a service to pilots
and aspiring pilots worldwide. Click
here for ways to show your appreciation for this service.
While much of this material comes from the FAA, parts of it are (c) Dauntless Software, all rights reserved. Webmasters: please
do not link directly to individual books in this library--rather,
please link to our main web page at www.dauntless-soft.com or
www.faatest.com. Thanks! |
|